PRODUCTS AND SERVICES

PRODUCTS AND SERVICES

Service Type

  • New Elevator Installation
  • Old Elevator Replacement
  • Elevator Addition to Existing Buildings
  • Installation Consultation and Supervision
  • New Residential Air Conditioner Installation
  • Air Conditioner Demolition and Replacement
  • Installation Process

    01

    Phase One: Precise Survey and Design

    02

    Phase Two: Hoistway Preparation and Recheck

    03

    Phase Three: Core Component Installation

    04

    Phase Four: Electrical and Control System Integration

    05

    Phase Five: Complete Machine Debugging and Multiple Inspections

    06

    Phase Six: Customer Training and Formal Delivery

    Case Study (Project Name: Elevator Project of China Mobile Production Dispatching Center)

    Part One: Project Overview and Objectives

    Project Vision

    Build a safe, efficient, comfortable and intelligent vertical transportation system that becomes a core highlight in Suqian and provides users with an excellent elevator-riding experience.

    Core Objective
  • Construction Period

    Respond actively to customer needs and ensure the project is delivered on time

  • Efficiency

    Average waiting time for elevators is less than 30 seconds, and congestion rate during peak hours is reduced by 40%

  • Intelligence

    Achieve group control scheduling optimization and fault predictive maintenance



  • Part Two: Core Challenges and Innovative Solutions

    Challenge 1:The conventional process cannot meet the construction period requirements
    Problem Description:

    During the construction of the project, it was affected by the epidemic. The delivery time between the podium and the main building was tight. The podium needed construction elevators, and the three major components of the main building's elevators were imported, resulting in a long construction period.
    Our solution: Place orders in advance to complete production and delivery.

    1How to Ensure Delivery

    The conventional practice is "completion of civil engineering → signature and seal confirmation of hoistway dimensions → placement of production orders → on-site installation". However, due to the tight construction period of the podium and the imported components of the main building's elevators, following the conventional process of waiting for the hoistway to be fully formed before placing production orders would severely hinder the construction and further affect the delivery of the entire project. We had to change the approach: after the civil engineering team confirmed the final version of the drawings, we placed production orders in advance when the hoistway was still unformed. Meanwhile, we tracked the hoistway construction progress and construction dimensions in real time to ensure there were no other rectification issues during the subsequent on-site installation.

    2How to Deliver Goods to the Construction Site During the Epidemic

    To comply with the national epidemic prevention policies and confirm the elevator delivery time, we communicated with the relevant authorities in advance on how to unload the goods at the project site and gave priority to completing the formalities.
    Results: We completed the installation in the order required by the Party A, prioritized the acceptance of one elevator for temporary use, and successfully delivered the project.

    Challenge 2:Tidal Phenomenon of Passenger Flow During Peak Hours
    Problem Description:

    During the morning rush hour and lunch break, passenger flow is concentrated in the restaurant area on the middle floors, leading to "stops on every floor" for elevators and low efficiency.
    The visitor mode is mixed with the office staff mode, and the scheduling strategy is single.
    Our solution: Install an additional elevator system.

    Add the ELINK system to the four elevators in the office building

    Through this ELINK equipment addition project, the elevators will be able to realize an intelligent elevator operation mode. Setting the peak-hour mode enables the automatic elevator grouping function, and the ELINK equipment performs overall data calculation for all elevators to improve operation efficiency. The system has a faster response speed and higher operation efficiency.

    Achievement Display

    Installing and implementing the ELINK equipment will greatly improve elevator operation efficiency. Additionally, the ELINK equipment can monitor the elevator operation status in real time, display the floor location when an elevator malfunctions, and the database can also monitor elevator usage efficiency. This enhances the overall operation quality of the elevators and ensures their safe operation.

    CONTACT US

  • Mob:+86-13235209958

  • E-mail:sales@hengtroneme.cn

  • Website:www.hengtroneme.cn

  • Add:8/F, No.557 Gongnong Road, Chongchuan District, Nantong City, Jiangsu Province

  • Suqian Branch Address:Room 417, Building B2-1, East Area, Intelligent Small HomeAppliance Industrial Park, Suqian Economic and Technological Development Zone

  • Address of Thailand Branch:Room 155/87 Sriracha District,Chonburi Province,Thailand

  • Copyright © 2025  HENGTRON EME  All Right Reserved.   Su ICP Record No. 2025208118  

    Technical support: SUEASY